SALT LAKE CITY AIRPORT TERMINAL 1

Salt Lake City International Airport
Terminal I Modification and Expansion
Salt Lake City, UT

Description: Ticket Lobby 2.jpg
Modified Central Lobby

 

Description: P1000234.JPG
New Passenger Screening

 

Description: IMAGE004.jpg
Queue space – Passenger Screening

 


Description: Ticket Lobby 1.jpg  Expanded Ticket Lobby

 

Project Description
GPA was the design architect for the $30 million Terminal I expansion and modification at the Salt Lake City International Airport. Phase I included the expansion of the ticket lobby and major remodel of the central lobby. Under Phase II, the existing ticketing was to be replaced and new in-line baggage screening facilities and Airline Ticket Offices (ATO’s) constructed. Working with a local architect of record, GPA provided planning and design for both program phases along with construction documents for selected building components. A number of factors made this project very challenging; the multi phasing to allow continuous operation during construction and the modernization and/or upgrade of existing infrastructure within building code and budget constraints.

 

Client: Salt Lake City Department of Airports
Scope: Design and Consulting Architect
Area: 160,000 sf (Phase I and II)
Cost: $30 million (Phase I and II)
Year Completed: 2006 (Phase I)